Wednesday, September 19, 2012

Lithium Fun

Today I got the CALB lithium cells installed!


I spent this morning install the circuit breaker and getting the CALB sells situated and strapped down. I have 550 lbs of batteries and 5 straps, 4 with 1200 lbs working strength and one with 2400 lbs working strength, much better than what i have with the lead sled.

I will be making a steel enclosure with a nice clear plastic top, but first I have to install the MiniBMS and drive it a bit! I could have finished today, but I did not have enough wire to install the MiniBMS. All I have left for a test drive is the BMS, so tomorrow evening I will start that and Friday will be a test drive!

No comments:

Post a Comment